Projects / Case Studies
The story behind the build.
A closer look at how flagship projects come together, from the brief and the engineering through to commissioning and handover. Full studies are being published here.
Featured
Flagship case studies
Aviation · Hydrant Systems
Cairo Airport TB2 & TB3
Delivering hydrant pipelines, cathodic protection and SCADA across two live terminals, including a 13,300 m run at TB3.
Aviation · Fuel Farm
Hurghada Fuelling Depot
A 7,500 m³ fuel farm engineered for filtration, water separation and firefighting, keeping product clear, bright and dry.
Aviation · Hydrant Systems
Borg El-Arab Hydrant System
A complete hydrant network with pit valves and valve chambers, feeding aircraft on stand to international standards.
