Stage 02–03 · Storage
Bulk storage tanks
Vertical Jet A1 tanks (T-1, T-3) and the loading canopy — the bunded storage reconstructed in the cutaway view.
◧ Process animation
Real project footage
On-site footage of the Al Majd · Warner Lewis Jet A1 aviation fuel farm, paired with the process it illustrates. Watch the real storage tanks, pump house, manifold, filtration skid and loading bays — the equipment reconstructed in the interactive process animation.
Stage 02–03 · Storage
Vertical Jet A1 tanks (T-1, T-3) and the loading canopy — the bunded storage reconstructed in the cutaway view.
Stage 03 · Tank monitoring
Daytime inspection past the Jet A1 tanks, access stairways and roof platforms.
Stage 04 · Pump transfer
Transfer and standby pumps with gate valves — the pumping station that draws from the floating suction.
Stage 04–05 · Pumps & filtration
The Warner Lewis team at the pump and filter / water-separator skid with its blue pumps and valves.
Stage 05 · Manifold & valves
Close-up of the valve manifold — gate valves and stainless pipework that route the flow.
Stage 07 · Loading dispatch
Operators on the loading gantry and manifold walkway where refuellers are filled.